{"id":1170,"date":"2026-07-29T00:15:32","date_gmt":"2026-07-28T18:45:32","guid":{"rendered":"https:\/\/www.cnc-system.com\/blog\/?p=1170"},"modified":"2026-07-29T00:15:32","modified_gmt":"2026-07-28T18:45:32","slug":"comprehensive-vs-non-comprehensive-amc-which-do-you-need","status":"publish","type":"post","link":"https:\/\/www.cnc-system.com\/blog\/comprehensive-vs-non-comprehensive-amc-which-do-you-need\/","title":{"rendered":"Comprehensive vs Non-Comprehensive AMC: Which One Do You Need?"},"content":{"rendered":"<p><!-- BLOG POST: Comprehensive vs Non-Comprehensive AMC: Which One Do You Need? WORDPRESS SETUP: \u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500 Title: Comprehensive vs Non-Comprehensive AMC: Which One Do You Need? Slug: comprehensive-vs-non-comprehensive-amc-which-do-you-need Category: AMC Services Featured image: 1075\u00d7716 px JPG (see image prompts at end of file) Rank Math Focus Keyword: comprehensive vs non-comprehensive AMC Rank Math Meta Description (155 chars): Comprehensive vs non-comprehensive AMC explained \u2014 what each covers, what SLA means, laptop AMC for 2 years cost, and which contract type is right for you. Tags: comprehensive AMC, non-comprehensive AMC, IT AMC, SLA, AMC for laptop, AMC contract India POST STATUS: Publish Date: July 2026 \u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500\u2500 PASTE EVERYTHING BELOW THIS LINE INTO THE CLASSIC EDITOR HTML VIEW --><\/p>\n<p><em>Last updated: July 2026 \u00b7 <strong>Classic Network and Computers (CNC)<\/strong>, O-41 West Patel Nagar, New Delhi \u00b7 <a href=\"https:\/\/www.cnc-system.com\/amc-and-services\">IT AMC Services \u2192<\/a><\/em><\/p>\n<p>You&#8217;ve decided your office needs an IT maintenance contract. Now comes the part that most vendors explain poorly: the difference between a <strong>comprehensive AMC<\/strong> and a <strong>non-comprehensive AMC<\/strong> \u2014 and which one actually makes financial sense for your situation. This guide breaks down both contract types in plain language, explains what SLA means and why it matters more than the monthly rate, and gives you real worked examples including <strong>laptop AMC cost for 2 years<\/strong> so you can evaluate any quote you receive.<\/p>\n<div style=\"background: #EFF6FF; border-left: 5px solid #1D4ED8; border-radius: 0 12px 12px 0; padding: 20px 24px; margin: 24px 0;\">\n<p style=\"margin: 0; font-size: 15px;\"><strong>One-line answer:<\/strong> Comprehensive AMC covers <em>labour + parts<\/em>. Non-comprehensive AMC covers <em>labour only<\/em> \u2014 you pay for parts separately. Which you need depends on your equipment age and how much budget uncertainty you can tolerate. Full explanation below.<\/p>\n<\/div>\n<h2 id=\"what-is-comprehensive-amc\"><span class=\"ez-toc-section\" id=\"What_Is_a_Comprehensive_AMC\"><\/span>What Is a Comprehensive AMC?<span class=\"ez-toc-section-end\"><\/span><\/h2><div id=\"ez-toc-container\" class=\"ez-toc-v2_0_85 counter-hierarchy ez-toc-counter ez-toc-grey ez-toc-container-direction\">\n<div class=\"ez-toc-title-container\">\n<p class=\"ez-toc-title\" style=\"cursor:inherit\">Table of Contents<\/p>\n<span class=\"ez-toc-title-toggle\"><a href=\"#\" class=\"ez-toc-pull-right ez-toc-btn ez-toc-btn-xs ez-toc-btn-default ez-toc-toggle\" aria-label=\"Toggle Table of Content\"><span class=\"ez-toc-js-icon-con\"><span class=\"\"><span class=\"eztoc-hide\" style=\"display:none;\">Toggle<\/span><span class=\"ez-toc-icon-toggle-span\"><svg style=\"fill: #999;color:#999\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" class=\"list-377408\" width=\"20px\" height=\"20px\" viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M6 6H4v2h2V6zm14 0H8v2h12V6zM4 11h2v2H4v-2zm16 0H8v2h12v-2zM4 16h2v2H4v-2zm16 0H8v2h12v-2z\" fill=\"currentColor\"><\/path><\/svg><svg style=\"fill: #999;color:#999\" class=\"arrow-unsorted-368013\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"10px\" height=\"10px\" viewBox=\"0 0 24 24\" version=\"1.2\" baseProfile=\"tiny\"><path d=\"M18.2 9.3l-6.2-6.3-6.2 6.3c-.2.2-.3.4-.3.7s.1.5.3.7c.2.2.4.3.7.3h11c.3 0 .5-.1.7-.3.2-.2.3-.5.3-.7s-.1-.5-.3-.7zM5.8 14.7l6.2 6.3 6.2-6.3c.2-.2.3-.5.3-.7s-.1-.5-.3-.7c-.2-.2-.4-.3-.7-.3h-11c-.3 0-.5.1-.7.3-.2.2-.3.5-.3.7s.1.5.3.7z\"\/><\/svg><\/span><\/span><\/span><\/a><\/span><\/div>\n<nav><ul class='ez-toc-list ez-toc-list-level-1 ' ><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-1\" href=\"https:\/\/www.cnc-system.com\/blog\/comprehensive-vs-non-comprehensive-amc-which-do-you-need\/#What_Is_a_Comprehensive_AMC\" >What Is a Comprehensive AMC?<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-2\" href=\"https:\/\/www.cnc-system.com\/blog\/comprehensive-vs-non-comprehensive-amc-which-do-you-need\/#What_comprehensive_AMC_typically_covers\" >What comprehensive AMC typically covers<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-3\" href=\"https:\/\/www.cnc-system.com\/blog\/comprehensive-vs-non-comprehensive-amc-which-do-you-need\/#What_comprehensive_AMC_usually_excludes\" >What comprehensive AMC usually excludes<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-4\" href=\"https:\/\/www.cnc-system.com\/blog\/comprehensive-vs-non-comprehensive-amc-which-do-you-need\/#What_Is_a_Non-Comprehensive_AMC\" >What Is a Non-Comprehensive AMC?<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-5\" href=\"https:\/\/www.cnc-system.com\/blog\/comprehensive-vs-non-comprehensive-amc-which-do-you-need\/#What_non-comprehensive_AMC_covers\" >What non-comprehensive AMC covers<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-6\" href=\"https:\/\/www.cnc-system.com\/blog\/comprehensive-vs-non-comprehensive-amc-which-do-you-need\/#What_non-comprehensive_AMC_excludes\" >What non-comprehensive AMC excludes<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-7\" href=\"https:\/\/www.cnc-system.com\/blog\/comprehensive-vs-non-comprehensive-amc-which-do-you-need\/#Comprehensive_vs_Non-Comprehensive_AMC_%E2%80%94_Side_by_Side\" >Comprehensive vs Non-Comprehensive AMC \u2014 Side by Side<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-8\" href=\"https:\/\/www.cnc-system.com\/blog\/comprehensive-vs-non-comprehensive-amc-which-do-you-need\/#What_Does_AMC_Cost_Mean_And_Why_It_Confuses_People\" >What Does AMC Cost Mean? (And Why It Confuses People)<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-9\" href=\"https:\/\/www.cnc-system.com\/blog\/comprehensive-vs-non-comprehensive-amc-which-do-you-need\/#1_AMC_rate_per_device_per_month\" >1. AMC rate per device per month<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-10\" href=\"https:\/\/www.cnc-system.com\/blog\/comprehensive-vs-non-comprehensive-amc-which-do-you-need\/#2_AMC_annual_contract_value\" >2. AMC annual contract value<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-11\" href=\"https:\/\/www.cnc-system.com\/blog\/comprehensive-vs-non-comprehensive-amc-which-do-you-need\/#3_AMC_cost_for_a_specific_duration_eg_2_years\" >3. AMC cost for a specific duration (e.g., 2 years)<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-12\" href=\"https:\/\/www.cnc-system.com\/blog\/comprehensive-vs-non-comprehensive-amc-which-do-you-need\/#Laptop_AMC_for_2_Years_%E2%80%94_What_Does_It_Cost\" >Laptop AMC for 2 Years \u2014 What Does It Cost?<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-13\" href=\"https:\/\/www.cnc-system.com\/blog\/comprehensive-vs-non-comprehensive-amc-which-do-you-need\/#Is_laptop_AMC_worth_it\" >Is laptop AMC worth it?<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-14\" href=\"https:\/\/www.cnc-system.com\/blog\/comprehensive-vs-non-comprehensive-amc-which-do-you-need\/#What_Is_SLA_in_an_AMC_Contract_Why_It_Matters_More_Than_the_Price\" >What Is SLA in an AMC Contract? Why It Matters More Than the Price<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-15\" href=\"https:\/\/www.cnc-system.com\/blog\/comprehensive-vs-non-comprehensive-amc-which-do-you-need\/#Common_SLA_types_in_IT_AMC_contracts_in_India\" >Common SLA types in IT AMC contracts in India<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-16\" href=\"https:\/\/www.cnc-system.com\/blog\/comprehensive-vs-non-comprehensive-amc-which-do-you-need\/#The_SLA_trap_resolution_time_vs_response_time\" >The SLA trap: resolution time vs response time<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-17\" href=\"https:\/\/www.cnc-system.com\/blog\/comprehensive-vs-non-comprehensive-amc-which-do-you-need\/#Which_AMC_Type_Do_You_Actually_Need_%E2%80%94_Decision_Guide\" >Which AMC Type Do You Actually Need? \u2014 Decision Guide<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-18\" href=\"https:\/\/www.cnc-system.com\/blog\/comprehensive-vs-non-comprehensive-amc-which-do-you-need\/#Choose_Non-Comprehensive_AMC_if\" >Choose Non-Comprehensive AMC if:<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-19\" href=\"https:\/\/www.cnc-system.com\/blog\/comprehensive-vs-non-comprehensive-amc-which-do-you-need\/#Choose_Comprehensive_AMC_if\" >Choose Comprehensive AMC if:<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-20\" href=\"https:\/\/www.cnc-system.com\/blog\/comprehensive-vs-non-comprehensive-amc-which-do-you-need\/#Worked_example_Which_AMC_for_a_10-laptop_Delhi_office\" >Worked example: Which AMC for a 10-laptop Delhi office?<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-21\" href=\"https:\/\/www.cnc-system.com\/blog\/comprehensive-vs-non-comprehensive-amc-which-do-you-need\/#AMC_Contract_Red_Flags_%E2%80%94_What_to_Watch_For\" >AMC Contract Red Flags \u2014 What to Watch For<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-22\" href=\"https:\/\/www.cnc-system.com\/blog\/comprehensive-vs-non-comprehensive-amc-which-do-you-need\/#%F0%9F%9A%A9_No_device_list_in_the_contract\" >\ud83d\udea9 No device list in the contract<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-23\" href=\"https:\/\/www.cnc-system.com\/blog\/comprehensive-vs-non-comprehensive-amc-which-do-you-need\/#%F0%9F%9A%A9_SLA_defined_in_business_hours_only\" >\ud83d\udea9 SLA defined in business hours only<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-24\" href=\"https:\/\/www.cnc-system.com\/blog\/comprehensive-vs-non-comprehensive-amc-which-do-you-need\/#%F0%9F%9A%A9_%E2%80%9CComprehensive%E2%80%9D_with_a_long_exclusion_list\" >\ud83d\udea9 &#8220;Comprehensive&#8221; with a long exclusion list<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-25\" href=\"https:\/\/www.cnc-system.com\/blog\/comprehensive-vs-non-comprehensive-amc-which-do-you-need\/#%F0%9F%9A%A9_No_parts_pricing_schedule_in_non-comprehensive_contracts\" >\ud83d\udea9 No parts pricing schedule in non-comprehensive contracts<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-26\" href=\"https:\/\/www.cnc-system.com\/blog\/comprehensive-vs-non-comprehensive-amc-which-do-you-need\/#%F0%9F%9A%A9_Auto-renewal_without_written_notice\" >\ud83d\udea9 Auto-renewal without written notice<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-27\" href=\"https:\/\/www.cnc-system.com\/blog\/comprehensive-vs-non-comprehensive-amc-which-do-you-need\/#%F0%9F%9A%A9_No_penalty_for_SLA_breach\" >\ud83d\udea9 No penalty for SLA breach<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-28\" href=\"https:\/\/www.cnc-system.com\/blog\/comprehensive-vs-non-comprehensive-amc-which-do-you-need\/#Frequently_Asked_Questions\" >Frequently Asked Questions<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-29\" href=\"https:\/\/www.cnc-system.com\/blog\/comprehensive-vs-non-comprehensive-amc-which-do-you-need\/#What_does_non-comprehensive_mean_in_an_AMC_contract\" >What does non-comprehensive mean in an AMC contract?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-30\" href=\"https:\/\/www.cnc-system.com\/blog\/comprehensive-vs-non-comprehensive-amc-which-do-you-need\/#What_does_AMC_cost_mean_%E2%80%94_is_it_the_monthly_rate_or_the_annual_total\" >What does AMC cost mean \u2014 is it the monthly rate or the annual total?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-31\" href=\"https:\/\/www.cnc-system.com\/blog\/comprehensive-vs-non-comprehensive-amc-which-do-you-need\/#What_is_SLA_in_an_AMC_and_why_does_it_matter\" >What is SLA in an AMC and why does it matter?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-32\" href=\"https:\/\/www.cnc-system.com\/blog\/comprehensive-vs-non-comprehensive-amc-which-do-you-need\/#What_is_the_cost_of_laptop_AMC_for_2_years_in_Delhi\" >What is the cost of laptop AMC for 2 years in Delhi?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-33\" href=\"https:\/\/www.cnc-system.com\/blog\/comprehensive-vs-non-comprehensive-amc-which-do-you-need\/#Can_I_switch_from_non-comprehensive_to_comprehensive_AMC_mid-contract\" >Can I switch from non-comprehensive to comprehensive AMC mid-contract?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-34\" href=\"https:\/\/www.cnc-system.com\/blog\/comprehensive-vs-non-comprehensive-amc-which-do-you-need\/#Does_AMC_cover_laptop_screens_and_batteries\" >Does AMC cover laptop screens and batteries?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-35\" href=\"https:\/\/www.cnc-system.com\/blog\/comprehensive-vs-non-comprehensive-amc-which-do-you-need\/#What_is_the_difference_between_comprehensive_and_non-comprehensive_AMC_for_servers\" >What is the difference between comprehensive and non-comprehensive AMC for servers?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-36\" href=\"https:\/\/www.cnc-system.com\/blog\/comprehensive-vs-non-comprehensive-amc-which-do-you-need\/#Not_sure_which_AMC_type_your_office_needs_CNC_assesses_for_free\" >Not sure which AMC type your office needs? CNC assesses for free.<\/a><\/li><\/ul><\/li><\/ul><\/nav><\/div>\n\n<p>A <strong>comprehensive AMC<\/strong> is an IT maintenance contract where both <strong>labour and spare parts<\/strong> are included in the annual fee. If a hard drive fails, the AMC vendor replaces it. If a keyboard stops working, it gets replaced. If a motherboard needs a component replaced, that is covered too \u2014 all at no extra charge beyond the agreed annual payment.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"What_comprehensive_AMC_typically_covers\"><\/span>What comprehensive AMC typically covers<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<ul>\n<li>All labour for repairs and maintenance visits<\/li>\n<li>Spare parts for covered faults: RAM, HDD\/SSD, keyboards, batteries (for laptops), fans, PSU\/SMPS, optical drives<\/li>\n<li>Consumables up to a defined limit (toner, thermal paste, cleaning materials for the maintenance visits)<\/li>\n<li>Scheduled preventive maintenance visits (typically quarterly)<\/li>\n<li>Priority response within the contracted SLA<\/li>\n<li>Software support: OS troubleshooting, driver updates, antivirus management<\/li>\n<\/ul>\n<h3><span class=\"ez-toc-section\" id=\"What_comprehensive_AMC_usually_excludes\"><\/span>What comprehensive AMC usually excludes<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<ul>\n<li>Physical damage caused by user misuse (dropping, liquid spills)<\/li>\n<li>Damage from natural disasters (flood, fire, lightning)<\/li>\n<li>Power surge damage beyond a defined threshold (though UPS-related damage is sometimes covered)<\/li>\n<li>Software licences and subscription renewals (Windows, Office, antivirus)<\/li>\n<li>Major peripheral upgrades (new monitors, new keyboards for aesthetic reasons)<\/li>\n<li>Data recovery from failed drives (this is a separate specialist service)<\/li>\n<\/ul>\n<h2 id=\"what-is-non-comprehensive-amc\"><span class=\"ez-toc-section\" id=\"What_Is_a_Non-Comprehensive_AMC\"><\/span>What Is a Non-Comprehensive AMC?<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>A <strong>non-comprehensive AMC<\/strong> (sometimes written as <em>non-comp AMC<\/em>) covers <strong>labour only<\/strong>. The vendor provides maintenance visits, breakdown support, and technician time \u2014 but if a part needs replacing, you pay for the part separately at the time of failure, usually at pre-agreed rates listed in the contract.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"What_non-comprehensive_AMC_covers\"><\/span>What non-comprehensive AMC covers<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<ul>\n<li>All labour for repairs and maintenance visits<\/li>\n<li>Scheduled preventive maintenance visits<\/li>\n<li>Priority response within the contracted SLA<\/li>\n<li>Software support: OS, drivers, antivirus, connectivity issues<\/li>\n<li>Minor consumables used during maintenance visits (thermal paste, cleaning)<\/li>\n<\/ul>\n<h3><span class=\"ez-toc-section\" id=\"What_non-comprehensive_AMC_excludes\"><\/span>What non-comprehensive AMC excludes<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<ul>\n<li>All spare parts \u2014 RAM, HDD, SSD, battery, keyboard, PSU, screens \u2014 paid by you at point of failure<\/li>\n<li>The same physical damage, disaster, and licence exclusions as comprehensive AMC<\/li>\n<\/ul>\n<h2 id=\"comprehensive-vs-non-comprehensive-comparison\"><span class=\"ez-toc-section\" id=\"Comprehensive_vs_Non-Comprehensive_AMC_%E2%80%94_Side_by_Side\"><\/span>Comprehensive vs Non-Comprehensive AMC \u2014 Side by Side<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<figure class=\"wp-block-table\">\n<table>\n<thead>\n<tr>\n<th><strong>Factor<\/strong><\/th>\n<th><strong>Comprehensive AMC<\/strong><\/th>\n<th><strong>Non-Comprehensive AMC<\/strong><\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Labour covered<\/td>\n<td>\u2705 Yes<\/td>\n<td>\u2705 Yes<\/td>\n<\/tr>\n<tr>\n<td>Spare parts covered<\/td>\n<td>\u2705 Yes<\/td>\n<td>\u274c No \u2014 you pay per part<\/td>\n<\/tr>\n<tr>\n<td>Monthly cost per desktop (Delhi 2026)<\/td>\n<td>\u20b9400 \u2013 \u20b9800<\/td>\n<td>\u20b9150 \u2013 \u20b9350<\/td>\n<\/tr>\n<tr>\n<td>Budget certainty<\/td>\n<td>High \u2014 fixed monthly cost<\/td>\n<td>Medium \u2014 labour fixed, parts variable<\/td>\n<\/tr>\n<tr>\n<td>Best for equipment age<\/td>\n<td>3+ years old<\/td>\n<td>Under 3 years old<\/td>\n<\/tr>\n<tr>\n<td>Risk of surprise costs<\/td>\n<td>Low<\/td>\n<td>Moderate if hardware starts failing<\/td>\n<\/tr>\n<tr>\n<td>Vendor&#8217;s financial risk<\/td>\n<td>Higher \u2014 they absorb parts cost<\/td>\n<td>Lower \u2014 parts risk stays with you<\/td>\n<\/tr>\n<tr>\n<td>Vendor parts quality concern<\/td>\n<td>Yes \u2014 verify OEM vs compatible<\/td>\n<td>Less concern \u2014 you see part invoices<\/td>\n<\/tr>\n<tr>\n<td>Right for offices with<\/td>\n<td>Older devices, finance-sensitive budgets, high-volume hardware use<\/td>\n<td>Newer devices, smaller offices, predictable usage<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/figure>\n<h2 id=\"what-does-amc-cost-mean\"><span class=\"ez-toc-section\" id=\"What_Does_AMC_Cost_Mean_And_Why_It_Confuses_People\"><\/span>What Does AMC Cost Mean? (And Why It Confuses People)<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>When a vendor quotes you an &#8220;AMC cost,&#8221; they typically quote one of three different things \u2014 and they don&#8217;t always clarify which:<\/p>\n<h3><span class=\"ez-toc-section\" id=\"1_AMC_rate_per_device_per_month\"><\/span>1. AMC rate per device per month<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>The most granular way to compare vendors. A quote of \u20b9250 per desktop per month means 10 desktops costs \u20b92,500\/month or \u20b930,000\/year. This is the most useful number for comparison shopping.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"2_AMC_annual_contract_value\"><\/span>2. AMC annual contract value<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>The total annual amount. A \u20b960,000 AMC for a 20-desktop office is \u20b9250\/desktop\/month \u2014 which may or may not be competitive depending on what is included. Always convert to per-device-per-month for comparison.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"3_AMC_cost_for_a_specific_duration_eg_2_years\"><\/span>3. AMC cost for a specific duration (e.g., 2 years)<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>Some contracts are quoted for 2 or 3 years. A 2-year AMC typically offers a 10\u201315% discount versus two separate annual contracts. This is where the <strong>&#8220;amc for laptop for 2 years cost&#8221;<\/strong> query comes from \u2014 buyers want to know if committing to 2 years saves money. It usually does, with one important caveat: if the vendor&#8217;s service quality declines mid-contract, a 2-year lock-in gives you less flexibility.<\/p>\n<div style=\"background: #F0FDF4; border-left: 5px solid #16A34A; border-radius: 0 12px 12px 0; padding: 20px 24px; margin: 24px 0;\">\n<p style=\"margin: 0; font-size: 15px;\"><strong>CNC recommendation on 2-year AMC:<\/strong> Take a 2-year contract only with a vendor you have already worked with for at least 3\u20136 months. First-year trial + 2-year renewal is smarter than committing 2 years upfront to an unknown vendor.<\/p>\n<\/div>\n<h2 id=\"laptop-amc-cost-2-years\"><span class=\"ez-toc-section\" id=\"Laptop_AMC_for_2_Years_%E2%80%94_What_Does_It_Cost\"><\/span>Laptop AMC for 2 Years \u2014 What Does It Cost?<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>Laptop AMC costs more per device than desktop AMC because laptops have more failure-prone components (hinges, screens, batteries, keyboards) and are harder to service (proprietary screws, delicate ribbon cables, harder-to-source parts).<\/p>\n<figure class=\"wp-block-table\">\n<table>\n<thead>\n<tr>\n<th><strong>Contract Type<\/strong><\/th>\n<th><strong>Monthly (Per Laptop)<\/strong><\/th>\n<th><strong>Annual (Per Laptop)<\/strong><\/th>\n<th><strong>2-Year Total (Per Laptop)<\/strong><\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Non-comprehensive (labour only)<\/td>\n<td>\u20b9200 \u2013 \u20b9400<\/td>\n<td>\u20b92,400 \u2013 \u20b94,800<\/td>\n<td>\u20b94,320 \u2013 \u20b98,640<\/td>\n<\/tr>\n<tr>\n<td>Comprehensive (labour + parts)<\/td>\n<td>\u20b9500 \u2013 \u20b9800<\/td>\n<td>\u20b96,000 \u2013 \u20b99,600<\/td>\n<td>\u20b910,800 \u2013 \u20b917,280<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/figure>\n<p><em>2-year rates include a 10% discount on the annual rate. Rates are for Delhi NCR, July 2026.<\/em><\/p>\n<h3><span class=\"ez-toc-section\" id=\"Is_laptop_AMC_worth_it\"><\/span>Is laptop AMC worth it?<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>Laptop screens crack. Batteries swell. Keyboards fail. Hinges break. A single screen replacement costs \u20b92,500\u2013\u20b96,999. A battery costs \u20b9799\u2013\u20b92,499. If your laptop develops even one hardware fault in 2 years \u2014 which is likely for any laptop over 18 months old \u2014 a comprehensive 2-year AMC pays for itself. For office laptops used daily by employees, AMC almost always makes financial sense from year 2 onward.<\/p>\n<h2 id=\"what-is-sla-in-amc\"><span class=\"ez-toc-section\" id=\"What_Is_SLA_in_an_AMC_Contract_Why_It_Matters_More_Than_the_Price\"><\/span>What Is SLA in an AMC Contract? Why It Matters More Than the Price<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>SLA stands for <strong>Service Level Agreement<\/strong>. In an IT AMC context, it defines the maximum time the vendor is contractually obligated to respond after you log a fault. It is the single most important metric in any AMC contract \u2014 more important than the monthly rate.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"Common_SLA_types_in_IT_AMC_contracts_in_India\"><\/span>Common SLA types in IT AMC contracts in India<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<figure class=\"wp-block-table\">\n<table>\n<thead>\n<tr>\n<th><strong>SLA Type<\/strong><\/th>\n<th><strong>What It Means<\/strong><\/th>\n<th><strong>Cost Premium<\/strong><\/th>\n<th><strong>Right For<\/strong><\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td><strong>4-hour on-site<\/strong><\/td>\n<td>Engineer physically at your office within 4 hours of call<\/td>\n<td>+30\u201350% over NBD<\/td>\n<td>Hospitals, trading floors, server-critical environments<\/td>\n<\/tr>\n<tr>\n<td><strong>8-hour on-site<\/strong><\/td>\n<td>Engineer on-site within 8 business hours (same day if called by noon)<\/td>\n<td>+15\u201325% over NBD<\/td>\n<td>Offices where half-day downtime is acceptable<\/td>\n<\/tr>\n<tr>\n<td><strong>Next Business Day (NBD)<\/strong><\/td>\n<td>Engineer on-site by the end of the next working day<\/td>\n<td>Standard rate<\/td>\n<td>Most Indian SMEs \u2014 usually fine for non-critical workloads<\/td>\n<\/tr>\n<tr>\n<td><strong>2-Business Day<\/strong><\/td>\n<td>Engineer on-site within 2 working days<\/td>\n<td>-10\u201320% below NBD<\/td>\n<td>Rarely acceptable for business use \u2014 be cautious<\/td>\n<\/tr>\n<tr>\n<td><strong>Remote only<\/strong><\/td>\n<td>No on-site visit \u2014 phone and remote desktop support only<\/td>\n<td>Cheapest<\/td>\n<td>Only if all devices are laptops that can be worked on remotely<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/figure>\n<h3><span class=\"ez-toc-section\" id=\"The_SLA_trap_resolution_time_vs_response_time\"><\/span>The SLA trap: resolution time vs response time<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>Most AMC contracts define <strong>response time<\/strong> (when the engineer arrives) but not <strong>resolution time<\/strong> (when the problem is fixed). An engineer who arrives within 4 hours but spends 3 days ordering parts has technically met the SLA while leaving you without a working computer for 3 days.<\/p>\n<p>A good AMC contract specifies both:<\/p>\n<ul>\n<li>Response time: maximum time from fault report to engineer on-site<\/li>\n<li>Part availability: standard parts available within X hours; specialty parts within X days<\/li>\n<li>Resolution time: maximum time for standard faults (e.g., HDD replacement \u2014 4 hours from diagnosis)<\/li>\n<\/ul>\n<h2 id=\"which-amc-type-do-you-need\"><span class=\"ez-toc-section\" id=\"Which_AMC_Type_Do_You_Actually_Need_%E2%80%94_Decision_Guide\"><\/span>Which AMC Type Do You Actually Need? \u2014 Decision Guide<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<h3><span class=\"ez-toc-section\" id=\"Choose_Non-Comprehensive_AMC_if\"><\/span>Choose Non-Comprehensive AMC if:<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<ul>\n<li>Your computers and laptops are <strong>under 2 years old<\/strong> \u2014 hardware failures are rare at this age, so paying for comprehensive parts coverage is premature<\/li>\n<li>You have a <strong>tight monthly budget<\/strong> and can absorb occasional part costs when they arise<\/li>\n<li>Your fleet is <strong>standardised<\/strong> (all one brand\/model) \u2014 parts are readily available and typically cheaper<\/li>\n<li>You have fewer than <strong>10 devices<\/strong> \u2014 the volume doesn&#8217;t justify the premium of comprehensive<\/li>\n<li>You want <strong>transparency<\/strong> on parts \u2014 you see every part invoice and can verify pricing<\/li>\n<\/ul>\n<h3><span class=\"ez-toc-section\" id=\"Choose_Comprehensive_AMC_if\"><\/span>Choose Comprehensive AMC if:<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<ul>\n<li>Your equipment is <strong>3 years or older<\/strong> \u2014 hardware failure rates increase significantly after year 3<\/li>\n<li>You need <strong>absolute budget certainty<\/strong> \u2014 your finance team cannot process variable IT invoices<\/li>\n<li>You run a <strong>large fleet (20+ devices)<\/strong> \u2014 statistically, someone&#8217;s hardware will fail every month<\/li>\n<li>Your staff use <strong>laptops intensively<\/strong> \u2014 screens, keyboards, and batteries take heavy punishment<\/li>\n<li>You have <strong>servers in the contract<\/strong> \u2014 server hardware failures are expensive; comprehensive coverage makes sense<\/li>\n<li>Your office is in an area with <strong>poor power quality<\/strong> \u2014 voltage fluctuations shorten component life and increase failure frequency<\/li>\n<\/ul>\n<h3><span class=\"ez-toc-section\" id=\"Worked_example_Which_AMC_for_a_10-laptop_Delhi_office\"><\/span>Worked example: Which AMC for a 10-laptop Delhi office?<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p><strong>Scenario:<\/strong> 10 laptops, all 2 years old (HP Pavilion), used daily by sales staff. Mix of field and office use. Budget: \u20b94,000\u2013\u20b96,000\/month for IT support.<\/p>\n<figure class=\"wp-block-table\">\n<table>\n<thead>\n<tr>\n<th><strong>Option<\/strong><\/th>\n<th><strong>Monthly Cost<\/strong><\/th>\n<th><strong>Annual Cost<\/strong><\/th>\n<th><strong>Risk<\/strong><\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Non-comprehensive (\u20b9300\/laptop\/month)<\/td>\n<td>\u20b93,000<\/td>\n<td>\u20b936,000<\/td>\n<td>If 3 batteries fail (\u20b91,200 each) + 1 screen (\u20b93,500) \u2192 extra \u20b97,100 that year<\/td>\n<\/tr>\n<tr>\n<td>Comprehensive (\u20b9600\/laptop\/month)<\/td>\n<td>\u20b96,000<\/td>\n<td>\u20b972,000<\/td>\n<td>Parts covered \u2014 no extra cost even if 5 batteries and 2 screens fail<\/td>\n<\/tr>\n<tr>\n<td>Break-even point<\/td>\n<td colspan=\"3\">If parts needed in the year cost more than \u20b936,000 total, comprehensive wins<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/figure>\n<p><strong>Verdict for this scenario:<\/strong> At 2 years old, non-comprehensive is likely cheaper for one more year. At year 3\u20134, switch to comprehensive. For field sales laptops (higher physical abuse), consider comprehensive from year 2.<\/p>\n<h2 id=\"amc-contract-red-flags\"><span class=\"ez-toc-section\" id=\"AMC_Contract_Red_Flags_%E2%80%94_What_to_Watch_For\"><\/span>AMC Contract Red Flags \u2014 What to Watch For<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>Many Indian businesses sign an AMC without reading it carefully and discover the exclusions only after a claim is rejected. These are the most common red flags:<\/p>\n<h3><span class=\"ez-toc-section\" id=\"%F0%9F%9A%A9_No_device_list_in_the_contract\"><\/span>\ud83d\udea9 No device list in the contract<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>If the contract says &#8220;office computers&#8221; without listing serial numbers or asset tags, the vendor can dispute whether any specific device is covered. Insist on a signed device inventory as an annexure to every AMC contract.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"%F0%9F%9A%A9_SLA_defined_in_business_hours_only\"><\/span>\ud83d\udea9 SLA defined in business hours only<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>A &#8220;4-hour SLA&#8221; that applies only between 9 AM and 6 PM on weekdays means a fault logged at 4:30 PM on a Friday might not see an engineer until Tuesday morning. Always check whether the SLA covers weekends and evenings.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"%F0%9F%9A%A9_%E2%80%9CComprehensive%E2%80%9D_with_a_long_exclusion_list\"><\/span>\ud83d\udea9 &#8220;Comprehensive&#8221; with a long exclusion list<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>Some vendors call a contract comprehensive while excluding screens, batteries, motherboards, and PSUs \u2014 which together cover 80% of hardware failures. A comprehensive AMC that excludes the most failure-prone parts is effectively a non-comprehensive contract at comprehensive pricing.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"%F0%9F%9A%A9_No_parts_pricing_schedule_in_non-comprehensive_contracts\"><\/span>\ud83d\udea9 No parts pricing schedule in non-comprehensive contracts<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>If the contract doesn&#8217;t list prices for commonly replaced parts, the vendor can charge whatever they like when something breaks. A proper non-comprehensive AMC includes a schedule: &#8220;HDD replacement: \u20b9X for Seagate 1TB; SSD 256GB: \u20b9Y; Battery HP Pavilion 15: \u20b9Z.&#8221;<\/p>\n<h3><span class=\"ez-toc-section\" id=\"%F0%9F%9A%A9_Auto-renewal_without_written_notice\"><\/span>\ud83d\udea9 Auto-renewal without written notice<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>Check the renewal clause. Some vendors auto-renew and raise prices by 10\u201315% unless you give 30 or 60 days&#8217; written notice before the expiry date. Set a calendar reminder 60 days before AMC expiry to review and renegotiate.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"%F0%9F%9A%A9_No_penalty_for_SLA_breach\"><\/span>\ud83d\udea9 No penalty for SLA breach<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>If the contract doesn&#8217;t specify what happens when the vendor misses the SLA (credit, free visit, price reduction), the SLA is an aspiration, not a commitment. A serious vendor will have an SLA credit clause \u2014 even if it&#8217;s just one free visit per breach.<\/p>\n<h2 id=\"amc-faqs\"><span class=\"ez-toc-section\" id=\"Frequently_Asked_Questions\"><\/span>Frequently Asked Questions<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<h3><span class=\"ez-toc-section\" id=\"What_does_non-comprehensive_mean_in_an_AMC_contract\"><\/span>What does non-comprehensive mean in an AMC contract?<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>Non-comprehensive in an AMC means the contract covers <em>labour only<\/em>. The vendor sends engineers for maintenance visits and breakdown support, but all spare parts \u2014 hard drives, RAM, batteries, screens, keyboards, power supplies \u2014 are charged separately at the time of failure. Non-comprehensive AMC is cheaper per month but introduces variable costs when hardware fails. It is most suitable for offices with equipment under 3 years old.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"What_does_AMC_cost_mean_%E2%80%94_is_it_the_monthly_rate_or_the_annual_total\"><\/span>What does AMC cost mean \u2014 is it the monthly rate or the annual total?<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>AMC cost can refer to either, and vendors use both interchangeably \u2014 which causes confusion. The most useful comparison metric is <em>cost per device per month<\/em>. Always ask vendors to break their quote down to \u20b9 per desktop per month (or per laptop per month, per server per month) so you can compare like for like. An annual quote of \u20b960,000 for 15 desktops is \u20b9333 per desktop per month \u2014 which you can then judge against the market rate.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"What_is_SLA_in_an_AMC_and_why_does_it_matter\"><\/span>What is SLA in an AMC and why does it matter?<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>SLA (Service Level Agreement) in an AMC defines the maximum time the vendor must respond after you report a fault. Common SLAs are 4-hour on-site, 8-hour on-site, and Next Business Day (NBD). A cheap AMC with a 2-business-day SLA may cost you far more in downtime losses than a slightly more expensive AMC with an NBD or 4-hour SLA. For most Indian offices, NBD SLA is sufficient; for hospitals, trading firms, and server-dependent operations, 4-hour SLA is worth the premium.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"What_is_the_cost_of_laptop_AMC_for_2_years_in_Delhi\"><\/span>What is the cost of laptop AMC for 2 years in Delhi?<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>Laptop AMC for 2 years in Delhi at CNC costs \u20b94,320\u2013\u20b98,640 per laptop for non-comprehensive (labour only) and \u20b910,800\u2013\u20b917,280 per laptop for comprehensive (labour + parts). Two-year contracts typically include a 10% discount over two separate annual contracts. For a 10-laptop office, expect \u20b943,200\u2013\u20b986,400 for a 2-year non-comprehensive contract and \u20b91,08,000\u2013\u20b91,72,800 for comprehensive.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"Can_I_switch_from_non-comprehensive_to_comprehensive_AMC_mid-contract\"><\/span>Can I switch from non-comprehensive to comprehensive AMC mid-contract?<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>This depends on the vendor. CNC allows mid-contract upgrades from non-comprehensive to comprehensive, with the price difference charged pro-rata for the remaining period. Downgrading from comprehensive to non-comprehensive mid-contract is less common and typically requires the vendor&#8217;s agreement. It is better to assess which type you need at the start and choose correctly \u2014 the worked example in this post helps you make that decision.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"Does_AMC_cover_laptop_screens_and_batteries\"><\/span>Does AMC cover laptop screens and batteries?<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>In comprehensive AMC \u2014 yes, screens and batteries are typically covered (check your contract&#8217;s exclusions list carefully; some vendors exclude screens). In non-comprehensive AMC \u2014 no, you pay for screens and batteries at the time of failure. At CNC, screens and batteries are listed in the standard non-comprehensive parts schedule so you know the cost upfront: HP\/Dell\/Lenovo batteries \u20b9799\u2013\u20b92,099; screens \u20b92,499\u2013\u20b96,999 depending on size and resolution.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"What_is_the_difference_between_comprehensive_and_non-comprehensive_AMC_for_servers\"><\/span>What is the difference between comprehensive and non-comprehensive AMC for servers?<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>For servers, the distinction matters more than for desktops. Server hardware failure \u2014 a failed RAID drive, a failed PSU, a RAM module \u2014 can take the entire organisation offline. Comprehensive AMC for servers ensures the vendor absorbs the cost of replacement drives (\u20b96,000\u2013\u20b925,000 per server-grade SAS\/SSD) and RAM (\u20b98,000\u2013\u20b930,000 for ECC server RAM). For any organisation where the server is business-critical, comprehensive server AMC is strongly recommended regardless of the server&#8217;s age.<\/p>\n<p><!-- CTA BLOCK \u2014 AMC format --><br \/>\n<!-- cnc-cta-block-v1 --><\/p>\n<div style=\"background: #FFF7ED; border-left: 5px solid #CD3214; border-radius: 0 12px 12px 0; padding: 24px 28px; margin: 36px 0;\">\n<p style=\"font-size: 13px; font-weight: bold; color: #cd3214; text-transform: uppercase; letter-spacing: .08em; margin: 0 0 8px;\">CNC Delhi \u2014 IT AMC Services<\/p>\n<h3 style=\"font-size: 22px; color: #1e293b; margin: 0 0 10px;\"><span class=\"ez-toc-section\" id=\"Not_sure_which_AMC_type_your_office_needs_CNC_assesses_for_free\"><\/span>Not sure which AMC type your office needs? CNC assesses for free.<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p style=\"font-size: 15px; color: #475569; margin: 0 0 20px;\">CNC provides both comprehensive and non-comprehensive IT AMC contracts for offices across Delhi NCR. We assess your device age, fleet size, and usage pattern and recommend the right contract type \u2014 without defaulting to the more expensive option. Free on-site assessment. Written quote within 24 hours. GST invoice. Since 1996.<\/p>\n<div style=\"display: flex; flex-wrap: wrap; gap: 10px;\"><a style=\"background: #CD3214; color: #fff; padding: 11px 22px; border-radius: 8px; font-weight: bold; font-size: 14px; text-decoration: none;\" href=\"https:\/\/www.cnc-system.com\/amc-and-services\">IT AMC Services at CNC \u2192<\/a><br \/>\n<a style=\"background: #25D366; color: #fff; padding: 11px 22px; border-radius: 8px; font-weight: bold; font-size: 14px; text-decoration: none;\" href=\"https:\/\/api.whatsapp.com\/send?phone=919810130131&amp;text=Hi%20CNC%2C%20I%20need%20an%20AMC%20quote%20for%20my%20office.%20Can%20you%20advise%20comprehensive%20or%20non-comprehensive%3F\" target=\"_blank\" rel=\"noopener\">\ud83d\udcac WhatsApp for Free Assessment<\/a><br \/>\n<a style=\"background: #1D4ED8; color: #fff; padding: 11px 22px; border-radius: 8px; font-weight: bold; font-size: 14px; text-decoration: none;\" href=\"tel:+919810130131\">\ud83d\udcde +91-9810130131<\/a><\/div>\n<\/div>\n<div style=\"background: #F8FAFC; border: 1px solid #E2E8F0; border-radius: 12px; padding: 20px 24px; margin: 20px 0;\">\n<p style=\"font-size: 13px; font-weight: bold; color: #64748b; text-transform: uppercase; letter-spacing: .06em; margin: 0 0 12px;\">Related Services at CNC<\/p>\n<div style=\"display: flex; flex-wrap: wrap; gap: 8px;\"><a style=\"background: #fff; border: 1.5px solid #E2E8F0; color: #334155; padding: 7px 15px; border-radius: 20px; font-size: 13px; font-weight: 600; text-decoration: none;\" href=\"https:\/\/www.cnc-system.com\/amc-and-services\">\ud83d\udee0 IT AMC Delhi<\/a><br \/>\n<a style=\"background: #fff; border: 1.5px solid #E2E8F0; color: #334155; padding: 7px 15px; border-radius: 20px; font-size: 13px; font-weight: 600; text-decoration: none;\" href=\"https:\/\/www.cnc-system.com\/laptop-repair-in-delhi\">\ud83d\udcbb Laptop Repair Delhi<\/a><br \/>\n<a style=\"background: #fff; border: 1.5px solid #E2E8F0; color: #334155; padding: 7px 15px; border-radius: 20px; font-size: 13px; font-weight: 600; text-decoration: none;\" href=\"https:\/\/www.cnc-system.com\/resident-engineer\">\ud83d\udc68\u200d\ud83d\udcbc Resident IT Engineer<\/a><br \/>\n<a style=\"background: #fff; border: 1.5px solid #E2E8F0; color: #334155; padding: 7px 15px; border-radius: 20px; font-size: 13px; font-weight: 600; text-decoration: none;\" href=\"https:\/\/www.cnc-system.com\/network-solution\">\ud83c\udf10 Network Solutions<\/a><\/div>\n<\/div>\n<div style=\"background: #F8FAFC; border: 1px solid #E2E8F0; border-radius: 12px; padding: 20px 24px; margin: 20px 0;\">\n<p style=\"font-size: 13px; font-weight: bold; color: #64748b; text-transform: uppercase; letter-spacing: .06em; margin: 0 0 12px;\">You May Also Like<\/p>\n<ul style=\"margin: 0; padding-left: 18px; line-height: 2.2; font-size: 14px;\">\n<li><a style=\"color: #cd3214; text-decoration: none; font-weight: 600;\" href=\"https:\/\/www.cnc-system.com\/blog\/it-amc-cost-india-2026-what-you-should-pay-per-desktop\/\">IT AMC Cost in India 2026: What You Should Actually Pay Per Desktop<\/a><\/li>\n<li><a style=\"color: #cd3214; text-decoration: none; font-weight: 600;\" href=\"https:\/\/www.cnc-system.com\/blog\/amc-services-for-computer-vs-on-demand-it-support-which-is-better\/\">Computer AMC vs On-Demand IT Support \u2014 Which Is Better?<\/a><\/li>\n<li><a style=\"color: #cd3214; text-decoration: none; font-weight: 600;\" href=\"https:\/\/www.cnc-system.com\/blog\/it-amc-in-delhi-cost-benefits-complete-business-guide\/\">IT AMC in Delhi \u2014 Cost, Benefits and Complete Business Guide<\/a><\/li>\n<\/ul>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Last updated: July 2026 \u00b7 Classic Network and Computers (CNC), O-41 West Patel Nagar, New Delhi \u00b7 IT AMC Services \u2192 You&#8217;ve decided your office needs an IT maintenance contract. Now comes the part that most vendors explain poorly: the difference between a comprehensive AMC and a non-comprehensive AMC \u2014 and which one actually makes&#8230;<\/p>\n","protected":false},"author":100,"featured_media":1171,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[13],"tags":[313,312,309,276,310,311],"class_list":["post-1170","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-amc-services","tag-amc-contract-india","tag-amc-for-laptop","tag-comprehensive-amc","tag-it-amc","tag-non-comprehensive-amc","tag-sla"],"_links":{"self":[{"href":"https:\/\/www.cnc-system.com\/blog\/wp-json\/wp\/v2\/posts\/1170","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.cnc-system.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.cnc-system.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.cnc-system.com\/blog\/wp-json\/wp\/v2\/users\/100"}],"replies":[{"embeddable":true,"href":"https:\/\/www.cnc-system.com\/blog\/wp-json\/wp\/v2\/comments?post=1170"}],"version-history":[{"count":1,"href":"https:\/\/www.cnc-system.com\/blog\/wp-json\/wp\/v2\/posts\/1170\/revisions"}],"predecessor-version":[{"id":1172,"href":"https:\/\/www.cnc-system.com\/blog\/wp-json\/wp\/v2\/posts\/1170\/revisions\/1172"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.cnc-system.com\/blog\/wp-json\/wp\/v2\/media\/1171"}],"wp:attachment":[{"href":"https:\/\/www.cnc-system.com\/blog\/wp-json\/wp\/v2\/media?parent=1170"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.cnc-system.com\/blog\/wp-json\/wp\/v2\/categories?post=1170"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.cnc-system.com\/blog\/wp-json\/wp\/v2\/tags?post=1170"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}