{"id":1377,"date":"2026-09-06T11:30:41","date_gmt":"2026-09-06T06:00:41","guid":{"rendered":"https:\/\/www.cnc-system.com\/blog\/?p=1377"},"modified":"2026-09-02T23:07:32","modified_gmt":"2026-09-02T17:37:32","slug":"ups-sizing-guide-kva-office-delhi-price","status":"publish","type":"post","link":"https:\/\/www.cnc-system.com\/blog\/ups-sizing-guide-kva-office-delhi-price\/","title":{"rendered":"How Many kVA UPS Does Your Office Need? Sizing Guide with Delhi Price Table"},"content":{"rendered":"<p>&#8220;How many kVA UPS do I need?&#8221; is the question we&#8217;re asked most about power backup \u2014 and the one most often answered with a guess. Guess low and the UPS overloads the first time the printer and the AC compressor kick in together. Guess high and you pay for capacity you&#8217;ll never use. The right answer takes four steps and ten minutes.<\/p>\n<p>This guide gives you the formula, worked examples for typical Delhi offices, a current price table, and the line-interactive vs online decision \u2014 so you can size it yourself or check what a vendor is quoting you.<\/p>\n<h2><span class=\"ez-toc-section\" id=\"Step_1_List_what_the_UPS_must_actually_keep_running\"><\/span>Step 1: List what the UPS must actually keep running<span class=\"ez-toc-section-end\"><\/span><\/h2><div id=\"ez-toc-container\" class=\"ez-toc-v2_0_87_1 counter-hierarchy ez-toc-counter ez-toc-grey ez-toc-container-direction\">\n<div class=\"ez-toc-title-container\">\n<p class=\"ez-toc-title\" style=\"cursor:inherit\">Table of Contents<\/p>\n<span class=\"ez-toc-title-toggle\"><a href=\"#\" class=\"ez-toc-pull-right ez-toc-btn ez-toc-btn-xs ez-toc-btn-default ez-toc-toggle\" aria-label=\"Toggle Table of Content\"><span class=\"ez-toc-js-icon-con\"><span class=\"\"><span class=\"eztoc-hide\" style=\"display:none;\">Toggle<\/span><span class=\"ez-toc-icon-toggle-span\"><svg style=\"fill: #999;color:#999\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" class=\"list-377408\" width=\"20px\" height=\"20px\" viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M6 6H4v2h2V6zm14 0H8v2h12V6zM4 11h2v2H4v-2zm16 0H8v2h12v-2zM4 16h2v2H4v-2zm16 0H8v2h12v-2z\" fill=\"currentColor\"><\/path><\/svg><svg style=\"fill: #999;color:#999\" class=\"arrow-unsorted-368013\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"10px\" height=\"10px\" viewBox=\"0 0 24 24\" version=\"1.2\" baseProfile=\"tiny\"><path d=\"M18.2 9.3l-6.2-6.3-6.2 6.3c-.2.2-.3.4-.3.7s.1.5.3.7c.2.2.4.3.7.3h11c.3 0 .5-.1.7-.3.2-.2.3-.5.3-.7s-.1-.5-.3-.7zM5.8 14.7l6.2 6.3 6.2-6.3c.2-.2.3-.5.3-.7s-.1-.5-.3-.7c-.2-.2-.4-.3-.7-.3h-11c-.3 0-.5.1-.7.3-.2.2-.3.5-.3.7s.1.5.3.7z\"\/><\/svg><\/span><\/span><\/span><\/a><\/span><\/div>\n<nav><ul class='ez-toc-list ez-toc-list-level-1 ' ><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-1\" href=\"https:\/\/www.cnc-system.com\/blog\/ups-sizing-guide-kva-office-delhi-price\/#Step_1_List_what_the_UPS_must_actually_keep_running\" >Step 1: List what the UPS must actually keep running<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-2\" href=\"https:\/\/www.cnc-system.com\/blog\/ups-sizing-guide-kva-office-delhi-price\/#Step_2_Add_up_the_watts\" >Step 2: Add up the watts<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-3\" href=\"https:\/\/www.cnc-system.com\/blog\/ups-sizing-guide-kva-office-delhi-price\/#Step_3_Convert_watts_to_kVA\" >Step 3: Convert watts to kVA<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-4\" href=\"https:\/\/www.cnc-system.com\/blog\/ups-sizing-guide-kva-office-delhi-price\/#Step_4_Add_headroom_and_round_up\" >Step 4: Add headroom and round up<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-5\" href=\"https:\/\/www.cnc-system.com\/blog\/ups-sizing-guide-kva-office-delhi-price\/#Three_worked_examples\" >Three worked examples<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-6\" href=\"https:\/\/www.cnc-system.com\/blog\/ups-sizing-guide-kva-office-delhi-price\/#How_much_backup_time_do_you_actually_need\" >How much backup time do you actually need?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-7\" href=\"https:\/\/www.cnc-system.com\/blog\/ups-sizing-guide-kva-office-delhi-price\/#Line-interactive_vs_online_UPS\" >Line-interactive vs online UPS<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-8\" href=\"https:\/\/www.cnc-system.com\/blog\/ups-sizing-guide-kva-office-delhi-price\/#Delhi_price_table_indicative_September_2026\" >Delhi price table (indicative, September 2026)<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-9\" href=\"https:\/\/www.cnc-system.com\/blog\/ups-sizing-guide-kva-office-delhi-price\/#Single-phase_or_three-phase_%E2%80%94_and_which_battery_chemistry\" >Single-phase or three-phase \u2014 and which battery chemistry<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-10\" href=\"https:\/\/www.cnc-system.com\/blog\/ups-sizing-guide-kva-office-delhi-price\/#Four_mistakes_that_void_the_whole_exercise\" >Four mistakes that void the whole exercise<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-11\" href=\"https:\/\/www.cnc-system.com\/blog\/ups-sizing-guide-kva-office-delhi-price\/#Frequently_asked_questions\" >Frequently asked questions<\/a><ul class='ez-toc-list-level-3' ><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-12\" href=\"https:\/\/www.cnc-system.com\/blog\/ups-sizing-guide-kva-office-delhi-price\/#Is_a_1_kVA_UPS_enough_for_5_computers\" >Is a 1 kVA UPS enough for 5 computers?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-13\" href=\"https:\/\/www.cnc-system.com\/blog\/ups-sizing-guide-kva-office-delhi-price\/#Can_I_connect_an_inverter_and_a_UPS_together\" >Can I connect an inverter and a UPS together?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-14\" href=\"https:\/\/www.cnc-system.com\/blog\/ups-sizing-guide-kva-office-delhi-price\/#Whats_the_difference_between_kVA_and_kW_on_a_UPS_label\" >What&#8217;s the difference between kVA and kW on a UPS label?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-15\" href=\"https:\/\/www.cnc-system.com\/blog\/ups-sizing-guide-kva-office-delhi-price\/#Does_CNC_supply_and_install_office_UPS_in_Delhi\" >Does CNC supply and install office UPS in Delhi?<\/a><\/li><\/ul><\/li><\/ul><\/nav><\/div>\n\n<p>Not everything. A UPS is for equipment that loses data or breaks when power drops \u2014 computers, the server, network cabinet, CCTV recorder, and perhaps the EPABX. Lights, fans, ACs, water dispensers and the pantry microwave belong on the generator or inverter, never on the computer UPS. Decide the protected list first; it&#8217;s usually smaller than people expect.<\/p>\n<h2><span class=\"ez-toc-section\" id=\"Step_2_Add_up_the_watts\"><\/span>Step 2: Add up the watts<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>Use nameplate ratings where you can, or these typical real-world figures:<\/p>\n<table>\n<thead>\n<tr>\n<th>Device<\/th>\n<th>Typical running watts<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Desktop PC (office, i3\/i5) + 22&#8243; LED monitor<\/td>\n<td>120\u2013180 W<\/td>\n<\/tr>\n<tr>\n<td>Workstation (i7, GPU) + 2 monitors<\/td>\n<td>350\u2013500 W<\/td>\n<\/tr>\n<tr>\n<td>Laptop with charger<\/td>\n<td>45\u201390 W<\/td>\n<\/tr>\n<tr>\n<td>Tower server<\/td>\n<td>300\u2013600 W<\/td>\n<\/tr>\n<tr>\n<td>Network cabinet (router, 24-port switch, firewall, 2 APs)<\/td>\n<td>100\u2013200 W<\/td>\n<\/tr>\n<tr>\n<td>CCTV NVR with 8 cameras (PoE)<\/td>\n<td>80\u2013150 W<\/td>\n<\/tr>\n<tr>\n<td>Laser printer (idle \/ printing)<\/td>\n<td>15 \/ 500\u2013900 W<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>Laser printers are the classic UPS-killer: their heater surges to nearly 1 kW when printing. Either leave them off the UPS or size for the surge.<\/p>\n<h2><span class=\"ez-toc-section\" id=\"Step_3_Convert_watts_to_kVA\"><\/span>Step 3: Convert watts to kVA<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>UPS capacity is rated in VA (volt-amperes), not watts. The relationship is the power factor \u2014 the fraction of VA that becomes usable watts. Modern online UPS units run at 0.8 to 0.9; older or budget models at 0.6 to 0.7. Use 0.8 as a safe default:<\/p>\n<p><strong>VA required = Total watts \u00f7 0.8<\/strong><\/p>\n<h2><span class=\"ez-toc-section\" id=\"Step_4_Add_headroom_and_round_up\"><\/span>Step 4: Add headroom and round up<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>Never run a UPS at its limit \u2014 batteries age, loads creep, and the printer gets replaced with a bigger one. Multiply by 1.25 for 25% headroom, then round up to the next standard size (1, 2, 3, 5, 6, 10 kVA).<\/p>\n<p><strong>Final size = (Total watts \u00f7 0.8) \u00d7 1.25<\/strong><\/p>\n<h2><span class=\"ez-toc-section\" id=\"Three_worked_examples\"><\/span>Three worked examples<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<table>\n<thead>\n<tr>\n<th>Office<\/th>\n<th>Protected load<\/th>\n<th>Watts<\/th>\n<th>\u00f7 0.8 \u00d7 1.25<\/th>\n<th>Choose<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Small office, 5 seats<\/td>\n<td>5 PCs, router, no server<\/td>\n<td>\u2248 850 W<\/td>\n<td>\u2248 1,330 VA<\/td>\n<td>2 kVA<\/td>\n<\/tr>\n<tr>\n<td>Trading firm, 12 seats<\/td>\n<td>12 PCs, network cabinet, NVR<\/td>\n<td>\u2248 2,100 W<\/td>\n<td>\u2248 3,280 VA<\/td>\n<td>3 kVA (tight) or 5 kVA<\/td>\n<\/tr>\n<tr>\n<td>Company, 30 seats + server<\/td>\n<td>30 PCs, server, cabinet, NVR<\/td>\n<td>\u2248 5,400 W<\/td>\n<td>\u2248 8,440 VA<\/td>\n<td>10 kVA<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h2><span class=\"ez-toc-section\" id=\"How_much_backup_time_do_you_actually_need\"><\/span>How much backup time do you actually need?<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>Capacity (kVA) and runtime (minutes) are separate decisions. Capacity is set by the load; runtime is set by battery bank size. Ask what the UPS must achieve during an outage:<\/p>\n<ul>\n<li><strong>Bridge to generator (2\u20135 minutes):<\/strong> the UPS only needs to cover the generator&#8217;s start-up. Small internal batteries suffice.<\/li>\n<li><strong>Safe shutdown, no generator (10\u201320 minutes):<\/strong> enough to save work and shut down cleanly. Standard for most small offices.<\/li>\n<li><strong>Work through short outages (30\u201360 minutes):<\/strong> requires an external battery bank, typically 4\u20138 \u00d7 12 V batteries for a 3\u20135 kVA unit. This is where cost climbs quickly.<\/li>\n<\/ul>\n<p>Rough runtime: a 3 kVA online UPS at 60% load with a 4-battery (12 V, 100 Ah) bank gives roughly 45\u201360 minutes. Halve the load and runtime roughly doubles. Your vendor should show you a runtime chart for the exact model \u2014 if they can&#8217;t, ask another vendor.<\/p>\n<h2><span class=\"ez-toc-section\" id=\"Line-interactive_vs_online_UPS\"><\/span>Line-interactive vs online UPS<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p><strong>Line-interactive<\/strong> (600 VA\u20133 kVA) passes mains power through with voltage regulation and switches to battery in a few milliseconds. Fine for individual PCs and small offices with reasonably stable supply.<\/p>\n<p><strong>Online double-conversion<\/strong> (1\u201310 kVA and beyond) continuously rebuilds clean power from the battery side, so the load never sees the mains. Zero transfer time, full protection from Delhi&#8217;s voltage swings and generator harmonics. Mandatory for servers, network cabinets, CCTV recorders and anything a trading desk depends on. For a shared office UPS, choose online.<\/p>\n<h2><span class=\"ez-toc-section\" id=\"Delhi_price_table_indicative_September_2026\"><\/span>Delhi price table (indicative, September 2026)<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<table>\n<thead>\n<tr>\n<th>Capacity<\/th>\n<th>Type<\/th>\n<th>Typical use<\/th>\n<th>Indicative price (\u20b9)<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>600\u20131,000 VA<\/td>\n<td>Line-interactive<\/td>\n<td>Single PC<\/td>\n<td>2,800 \u2013 6,000<\/td>\n<\/tr>\n<tr>\n<td>1 kVA<\/td>\n<td>Online<\/td>\n<td>Network cabinet \/ NVR<\/td>\n<td>8,000 \u2013 13,000<\/td>\n<\/tr>\n<tr>\n<td>2 kVA<\/td>\n<td>Online<\/td>\n<td>5\u20138 PCs<\/td>\n<td>15,000 \u2013 24,000<\/td>\n<\/tr>\n<tr>\n<td>3 kVA<\/td>\n<td>Online<\/td>\n<td>10\u201315 PCs<\/td>\n<td>24,000 \u2013 38,000<\/td>\n<\/tr>\n<tr>\n<td>5 kVA<\/td>\n<td>Online<\/td>\n<td>15\u201325 PCs or server room<\/td>\n<td>48,000 \u2013 75,000<\/td>\n<\/tr>\n<tr>\n<td>6 kVA<\/td>\n<td>Online<\/td>\n<td>25\u201330 PCs<\/td>\n<td>60,000 \u2013 95,000<\/td>\n<\/tr>\n<tr>\n<td>10 kVA<\/td>\n<td>Online (1-ph \/ 3-ph)<\/td>\n<td>30\u201350 PCs + server<\/td>\n<td>1,20,000 \u2013 2,00,000<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><em>Unit prices only; external battery banks add \u20b910,000\u2013\u20b960,000 depending on runtime, and installation with proper earthing and distribution is extra. Brand, warranty and battery chemistry move prices within the range. Prices exclude GST.<\/em><\/p>\n<h2><span class=\"ez-toc-section\" id=\"Single-phase_or_three-phase_%E2%80%94_and_which_battery_chemistry\"><\/span>Single-phase or three-phase \u2014 and which battery chemistry<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>Up to about 6 kVA, single-phase online UPS units are standard and connect to a normal (appropriately rated) circuit. From 10 kVA upward, most office buildings in Delhi have three-phase supply available, and three-phase input units are more efficient and easier on the building&#8217;s electrical balance; some can still deliver single-phase output for computer loads. Your electrician confirms what the building offers; the UPS vendor matches the unit to it.<\/p>\n<p>On batteries: sealed lead-acid (VRLA\/SMF) remains the default for cost \u2014 cheap to buy, two to four years of life in Delhi&#8217;s heat, and needs a well-ventilated location. Lithium iron phosphate (LiFePO\u2084) banks cost roughly two to three times more upfront, last eight to ten years, weigh a third as much and tolerate heat better, so the lifetime cost often favours lithium for units that will run for years in a warm cabinet. For a small office replacing batteries every three summers, lead-acid is fine; for a server room, lithium is increasingly the sensible choice.<\/p>\n<h2><span class=\"ez-toc-section\" id=\"Four_mistakes_that_void_the_whole_exercise\"><\/span>Four mistakes that void the whole exercise<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<ul>\n<li><strong>No earthing check.<\/strong> A UPS on a bad earth protects nothing and may itself fail. Test earthing before installation.<\/li>\n<li><strong>Printer on the computer UPS.<\/strong> One print job trips the whole office.<\/li>\n<li><strong>Ignoring battery replacement.<\/strong> Batteries last 2\u20134 years in Delhi heat; budget for it or the UPS becomes a very expensive surge protector.<\/li>\n<li><strong>Undersized wiring.<\/strong> A 5 kVA unit on a 16 A socket circuit is a fire risk. The electrician sizes the circuit; the UPS vendor should insist on it.<\/li>\n<\/ul>\n<h2><span class=\"ez-toc-section\" id=\"Frequently_asked_questions\"><\/span>Frequently asked questions<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<h3><span class=\"ez-toc-section\" id=\"Is_a_1_kVA_UPS_enough_for_5_computers\"><\/span>Is a 1 kVA UPS enough for 5 computers?<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>Usually not. Five office PCs with monitors draw around 750\u2013900 W, which needs roughly 1,400 VA with headroom. A 2 kVA online unit is the right minimum.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"Can_I_connect_an_inverter_and_a_UPS_together\"><\/span>Can I connect an inverter and a UPS together?<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>Yes \u2014 the inverter runs lights and fans, the online UPS runs computers. Keep them on separate circuits, and ensure the inverter output is a pure sine wave if any part of it feeds the UPS input.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"Whats_the_difference_between_kVA_and_kW_on_a_UPS_label\"><\/span>What&#8217;s the difference between kVA and kW on a UPS label?<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>kW is the real power available; kVA is apparent power. A 3 kVA UPS with 0.8 power factor delivers 2.4 kW. Always size against kW when comparing models with different power factors.<\/p>\n<h3><span class=\"ez-toc-section\" id=\"Does_CNC_supply_and_install_office_UPS_in_Delhi\"><\/span>Does CNC supply and install office UPS in Delhi?<span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p>Yes \u2014 sizing survey, supply, battery bank design, installation with earthing verification, and AMC. See our <a href=\"https:\/\/www.cnc-system.com\/ups\">UPS and power conditioning<\/a> page.<\/p>\n<div style=\"margin: 32px 0; padding: 24px; background: #f0f6ff; border: 1px solid #c7ddff; border-radius: 12px;\">\n<p style=\"margin: 0 0 8px; font-size: 18px;\"><strong>Not sure of your load? We&#8217;ll measure it<\/strong><\/p>\n<p style=\"margin: 0 0 14px;\">CNC does an on-site load survey, recommends the exact kVA and runtime, and supplies and installs the UPS with proper earthing and distribution. Delhi since 1996, 4.9\u2605 from 983 Google reviews.<\/p>\n<p style=\"margin: 0;\">\ud83d\udcde <a href=\"tel:+919810130131\"><strong>+91-98101-30131<\/strong><\/a> \u00a0\u00b7\u00a0 \ud83d\udcac <a href=\"https:\/\/wa.me\/918130992267?text=Hi%20CNC%2C%20I%20need%20a%20UPS%20sizing%20survey%20for%20my%20office.%20My%20name%20is%20___%20and%20my%20office%20is%20in%20___.\" target=\"_blank\" rel=\"noopener\"><strong>WhatsApp us<\/strong><\/a> \u00a0\u00b7\u00a0 <a href=\"https:\/\/www.cnc-system.com\/ups\">UPS solutions \u2192<\/a><\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>&#8220;How many kVA UPS do I need?&#8221; is the question we&#8217;re asked most about power backup \u2014 and the one most often answered with a guess. Guess low and the UPS overloads the first time the printer and the AC compressor kick in together. Guess high and you pay for capacity you&#8217;ll never use. The&#8230;<\/p>\n","protected":false},"author":100,"featured_media":1378,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[56],"tags":[472,196,488,487,343],"class_list":["post-1377","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-ups-power-protection","tag-delhi-ncr","tag-hardware","tag-office-setup","tag-power-backup","tag-ups"],"_links":{"self":[{"href":"https:\/\/www.cnc-system.com\/blog\/wp-json\/wp\/v2\/posts\/1377","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.cnc-system.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.cnc-system.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.cnc-system.com\/blog\/wp-json\/wp\/v2\/users\/100"}],"replies":[{"embeddable":true,"href":"https:\/\/www.cnc-system.com\/blog\/wp-json\/wp\/v2\/comments?post=1377"}],"version-history":[{"count":1,"href":"https:\/\/www.cnc-system.com\/blog\/wp-json\/wp\/v2\/posts\/1377\/revisions"}],"predecessor-version":[{"id":1379,"href":"https:\/\/www.cnc-system.com\/blog\/wp-json\/wp\/v2\/posts\/1377\/revisions\/1379"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.cnc-system.com\/blog\/wp-json\/wp\/v2\/media\/1378"}],"wp:attachment":[{"href":"https:\/\/www.cnc-system.com\/blog\/wp-json\/wp\/v2\/media?parent=1377"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.cnc-system.com\/blog\/wp-json\/wp\/v2\/categories?post=1377"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.cnc-system.com\/blog\/wp-json\/wp\/v2\/tags?post=1377"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}